Bogue Chitto (North) HEC-HMS August2016 Validation Flood Event

The August2016 flood event was used to confirm the gridded MRMS QPE data, gridded infiltration, and Mod-clark grids are working correctly. The Bogue Chitto HEC-HMS Calibration and Validation Model model was used to produce inflow hydrographs for the HEC-RAS model.

Model Software Version

HEC-HMS version 4.11

Model Application

Bogue Chitto HEC-HMS Calibration and Validation Model

Simulation Type

CALIBRATION

Input Files

Title Description Location
Evapotranspiration DSS File Parsed from CH.gage file ET.dss
Basin File CH_N_August_2016.basin
Meteorology File August 2016 Flood; August 12-14; The purpose of this event is to confirm the gridded precipitation, gridded infiltration, and Mod-Clark grids are working correctly. August_2016_Flood.met
Control File August 2016 Flood; August 12-19; The purpose of this event is to confirm the gridded precipitation, gridded infiltration, and Mod-Clark grids are working correctly. August_2016.control

Output files

Title Location
Output DSS File CH_N_August_2016.dss

Parameters

Parameter Value
Canopy ["Gridded Simple"]
LossRate ["Gridded Deficit Constant"]
Transform ["Modified Clark"]
Baseflow ["Linear Reservoir"]
Route ["Modified Puls"]
Precipitation Method Gridded Precipitation

Temporal extent

2016-08-08
2016-08-24

Temporal resolution

5 Minutes

Resource Files

Info: Please log in to view and download resource files.

Metadata record information

Created At 2024-06-12t13:27:55.098797+00:00
Created By kslover@dewberry.com
Is Reviewed True
Access Level Public
Owner kslover@dewberry.com