Bogue Chitto (North) HEC-HMS September2008 Calibration Flood Event
The September2008 flood event was used to confirm the gridded StageIV QPE data, gridded infiltration, and Mod-clark grids are working correctly. The Bogue Chitto HEC-HMS Calibration and Validation Model model was used to produce inflow hydrographs for the HEC-RAS model.
Model Software Version
HEC-HMS version 4.11Model Application
Bogue Chitto HEC-HMS Calibration and Validation ModelSimulation Type
CALIBRATIONInput Files
| Title | Description | Location |
|---|---|---|
| Evapotranspiration DSS File | Parsed from CH.gage file | ET.dss |
| Basin File | CH_N_Gustav_September_2008.basin | |
| Meteorology File | September_2008_Flood.met | |
| Control File | September_2008.control |
Output files
| Title | Location |
|---|---|
| Output DSS File | CH_N_Gustav_September_2008_North.dss |
Parameters
| Parameter | Value |
|---|---|
| Canopy | ["Gridded Simple"] |
| LossRate | ["Gridded Deficit Constant"] |
| Transform | ["Modified Clark"] |
| Baseflow | ["Linear Reservoir"] |
| Route | ["Modified Puls"] |
| Precipitation Method | Gridded Precipitation |
Temporal extent
| 2008-08-30 |
| 2008-09-13 |
Temporal resolution
5 MinutesResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created At | 2024-06-12t12:41:13.471761+00:00 |
| Created By | kslover@dewberry.com |
| Is Reviewed | True |
| Access Level | Public |
| Owner | kslover@dewberry.com |