Bogue Chitto (South) HEC-HMS September2002 Validation Flood Event
The September2002 flood event was used to confirm the gridded StageIV QPE data, gridded infiltration, and Mod-clark grids are working correctly. The Bogue Chitto HEC-HMS Calibration and Validation Model model was used to produce inflow hydrographs for the HEC-RAS model.
Model Software Version
HEC-HMS version 4.11Model Application
Bogue Chitto HEC-HMS Calibration and Validation ModelSimulation Type
VALIDATIONInput Files
| Title | Description | Location |
|---|---|---|
| Evapotranspiration DSS File | Parsed from CH.gage file | ET.dss |
| Basin File | CH_S_Isidore_September_2002_South.basin | |
| Meteorology File | September_2002_Flood.met | |
| Control File | September_2002.control |
Output files
| Title | Location |
|---|---|
| Output DSS File | CH_S_Isidore_September_2002_South.dss |
Parameters
| Parameter | Value |
|---|---|
| Canopy | ["Gridded Simple"] |
| LossRate | ["Gridded Deficit Constant"] |
| Transform | ["Modified Clark"] |
| Baseflow | ["Linear Reservoir"] |
| Route | ["Modified Puls"] |
| Precipitation Method | Gridded Precipitation |
Temporal extent
| 2002-09-23 |
| 2002-10-02 |
Temporal resolution
5 MinutesResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created At | 2024-06-12t13:48:10.520397+00:00 |
| Created By | kslover@dewberry.com |
| Is Reviewed | True |
| Access Level | Public |
| Owner | kslover@dewberry.com |