Bayou Sara-Thompson (Thompson Creek) HEC-HMS August2012 Calibration Flood Event
The August2012 flood event was used to confirm the gridded StageIV QPE data, gridded infiltration, and Mod-clark grids are working correctly. The Bayou Sara-Thompson HEC-HMS Calibration and Validation Model model was used to produce inflow hydrographs for the HEC-RAS model.
Model Software Version
HEC-HMS version 4.11Model Application
Bayou Sara-Thompson HEC-HMS Calibration and Validation ModelSimulation Type
VALIDATIONInput Files
| Title | Location |
|---|---|
| Basin File | ST_BST_TC_August_2012.basin |
| Meteorology File | August_2012_Flood.met |
| Control File | August_2012_Flood.control |
Output files
| Title | Location |
|---|---|
| Output DSS File | ST_BST_TC_August_2012.dss |
Parameters
| Parameter | Value |
|---|---|
| Canopy | ["Gridded Simple"] |
| LossRate | ["Gridded Deficit Constant"] |
| Transform | ["Modified Clark"] |
| Baseflow | ["Linear Reservoir"] |
| Route | ["Modified Puls"] |
| Precipitation Method | Gridded Precipitation |
Temporal extent
| 2012-08-27 |
| 2012-09-05 |
Temporal resolution
5 MinutesResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created By | kslover@dewberry.com |
| Created At | 2024-06-27t13:02:07.569536+00:00 |
| Access Level | Public |
| Is Reviewed | True |
| Owner | kslover@dewberry.com |