LWI Region 5 Mermentau Headwaters - HEC-HMS Simulation: Gustav_Calibration
Calibration using Hurricane Gustav 2008 storm. Basin: B_CalibratedBase. Meteorology: GARR_2008_08-09_Gustav. Control: Historical_Gustav.
Model Software Version
HEC-HMS version 4.11Model Application
LWI Region 5 Mermentau Headwaters HEC-HMS ModelSimulation Type
CALIBRATIONInput Files
| Title | Description | Location |
|---|---|---|
| Control File | Configuration for start time, end time, and time interval. One per control specifications. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/Historical_Gustav.control |
| DSS Input File | Project DSS file containing manual entry time-series gages and paired data. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/Region5_MH_Observed.dss |
| Meteorologic File | Configuration for precipitation, evapotranspiration, and snowmelt data. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/GARR_2008_08_09_Gustav.met |
Output files
| Title | Description | Location |
|---|---|---|
| DSS Output File | Stores simulation hydrologic and hydraulic results at junctions, reaches, sources, diversions, and sinks. Hydrologic Model output for Hurricane Gustav 2008 calibration event. Times are in UTC. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/Gustav_Calibration.dss |
Parameters
| Parameter | Value |
|---|---|
| Canopy | ["Dynamic"] |
| LossRate | ["Gridded Deficit Constant"] |
| Transform | ["Modified Clark"] |
| Baseflow | ["Recession"] |
| Route | ["Muskingum Cunge","Controlled Outflow"] |
| Precipitation Method | Gridded Precipitation |
Temporal extent
| 2008-08-23 |
| 2008-09-10 |
Temporal resolution
15 MinutesResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created By | hdr_lwi_region_5@hdrinc.com |
| Created At | 2024-06-27t18:47:49.479333+00:00 |
| Access Level | Public |
| Is Reviewed | True |
| Owner | hdr_lwi_region_5@hdrinc.com |