LWI Region 5 Mermentau Headwaters - HEC-HMS Simulation: May 2017 Validation
Validation using May 2017 storm. Basin: B_CalibratedBase. Meteorology: GARR_2017_05. Control: Historical_2017_05.
Model Software Version
HEC-HMS version 4.11Model Application
LWI Region 5 Mermentau Headwaters HEC-HMS ModelSimulation Type
VALIDATIONInput Files
| Title | Description | Location |
|---|---|---|
| Control File | Configuration for start time, end time, and time interval. One per control specifications. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/Historical_2017_05.control |
| DSS Input File | Project DSS file containing manual entry time-series gages and paired data. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/Region5_MH_Observed.dss |
| Meteorologic File | Radar Rainfall grids for May 2017 event. Resolution is 1,000m, 1-hour. Time is in UTC. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/GARR_2017_05.met |
Output files
| Title | Description | Location |
|---|---|---|
| DSS Output File | Stores simulation hydrologic and hydraulic results at junctions, reaches, sources, diversions, and sinks. Hydrologic Model output for May 2017 validation event. Times are in UTC. | /R05_MH_HEC-HMS/MH_RI_MrmntHdwt/May2017_Validation.dss |
Parameters
| Parameter | Value |
|---|---|
| Canopy | ["Dynamic"] |
| LossRate | ["Gridded Deficit Constant"] |
| Transform | ["Modified Clark"] |
| Baseflow | ["Recession"] |
| Route | ["Muskingum Cunge","Controlled Outflow"] |
| Precipitation Method | Gridded Precipitation |
Temporal extent
| 2017-04-29 |
| 2017-05-10 |
Temporal resolution
15 MinutesResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created By | hdr_lwi_region_5@hdrinc.com |
| Created At | 2024-06-27t20:57:29.552500+00:00 |
| Access Level | Public |
| Is Reviewed | True |
| Owner | hdr_lwi_region_5@hdrinc.com |