Bogue Chitto HEC-FIA - October2019 simulation

Simulation performed with the Bogue Chitto HEC-FIA model. Simulation incudes the October2019 event to analyze the affect of the October2019 event on structures in the watershed.

Model Software Version

HEC-FIA version 3.3

Model Application

LWI R7 Bogue Chitto Watershed HEC-FIA model

Simulation Type

CALIBRATION

Input Files

Title Location Source Dataset
Max Depth InputGrids/DepthGrids/October2019_Calibration_MaxDepth.tif
Emergency Planning Zones geographic data/emergency planning zones/EPZ.shp
Inventory Data inventory/structure inventories/BogueChitto_Structures.dbf LWI Structures Inventory Version 1.3

Output files

Title Description Location
Economic Results Resulting Economic Damages runs/ValidationCalibration/October2019_CALIBRATION/October2019_Calibration_MaxDepth/Olga/EconResults.shp

Parameters

Parameter Value
Random Seed 0.0
Confidence 0.9
Convergence Tolerance 0.05
Convergence Variable Total Damage

Temporal extent

2019-10-25
2019-10-31

Resource Files

Info: Please log in to view and download resource files.

Metadata record information

Created By kslover@dewberry.com
Created At 2025-06-05t13:56:59.871763+00:00
Access Level Public
Is Reviewed True
Owner kslover@dewberry.com