LWI R7 Lake Maurepas Hammond PoC RAS: Proposed East Pond 50YR 48HR
2D Unsteady flow analysis for 5 year 24 hour AEP event HUC10 model for the proposed conditions ( East Ponds only) for the Hammond Diversion and Detention Proof of Concept model for LWI TO4
Model Software Version
HEC-RAS version 6.4.1Model Application
LWI R7 Lake Maurepas Hammond PoCSimulation Type
PRODUCTION_RUNInput Files
| Title | Description | Location |
|---|---|---|
| DSS File | DSS File | Hydro DSS/PM_Design_050YR_24HR.dss |
| b file | RAS master input text file | LWI_R7_Maurepas.b47 |
| g file | RAS geometry file | LWI_R7_Maurepas.g10 |
| c file | Binary Geometry file from Geom Prep | LWI_R7_Maurepas.c10 |
| x file | Geometry master input text file | LWI_R7_Maurepas.x10 |
| u file | unsteady flow file | LWI_R7_Maurepas.u20 |
| u hdf file | unsteady flow file in HDF format | LWI_R7_Maurepas.u20.hdf |
Output files
| Title | Description | Location |
|---|---|---|
| p file | Model plan data | LWI_R7_Maurepas.p47 |
| p hdf file | result output in HDF format | LWI_R7_Maurepas.p47.hdf |
| DSS Output File | HEC-RAS output file in DSS format | LWI_R7_Maurepas.dss |
Parameters
| Parameter | Value |
|---|---|
Temporal extent
| 2024-01-01 |
| 2024-01-07 |
Temporal resolution
10SECResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created By | kslover@dewberry.com |
| Created At | 2025-06-25t17:52:31.807527+00:00 |
| Access Level | Public |
| Is Reviewed | True |
| Owner | kslover@dewberry.com |