LWI R7 Lake Maurepas Hammond PoC RAS: Proposed East Pond 5YR 48HR

2D Unsteady flow analysis for 5 year 24 hour AEP event HUC10 model for the proposed conditions (East Ponds only) for the Hammond Diversion and Detention Proof of Concept model for LWI TO4

Model Software Version

HEC-RAS version 6.4.1

Model Application

LWI R7 Lake Maurepas Hammond PoC

Simulation Type

PRODUCTION_RUN

Input Files

Title Description Location
DSS File DSS File Hydro DSS/PM_Design_005YR_24HR.dss
b file RAS master input text file LWI_R7_Maurepas.b49
g file RAS geometry file LWI_R7_Maurepas.g10
c file Binary Geometry file from Geom Prep LWI_R7_Maurepas.c10
x file Geometry master input text file LWI_R7_Maurepas.x10
u file unsteady flow file LWI_R7_Maurepas.u24
u hdf file unsteady flow file in HDF format LWI_R7_Maurepas.u24.hdf

Output files

Title Description Location
p file Model plan data LWI_R7_Maurepas.p49
p hdf file result output in HDF format LWI_R7_Maurepas.p49.hdf
DSS Output File HEC-RAS output file in DSS format LWI_R7_Maurepas.dss

Parameters

Parameter Value

Temporal extent

2024-01-01
2024-01-07

Temporal resolution

10SEC

Resource Files

Info: Please log in to view and download resource files.

Metadata record information

Created By kslover@dewberry.com
Created At 2025-06-25t17:52:45.456386+00:00
Access Level Public
Is Reviewed True
Owner kslover@dewberry.com

  • 2026-07-06 17:39:02.022000 - edit - fmessina
  • 2025-08-15 15:37:21.427000 - edit - fmessina
  • 2025-06-25 17:52:45.542000 - create - Kevin Slover