LWI R7 Lake Maurepas (SJB SWMP PoC) RAS: 100YR 24HR Proposed5
2D Unsteady flow analysis for 100 year 24 hour AEP event Breakout PoC Base Geometry for the proposed conditions (Project: Farm Road Drainage Improvements) for the SJBP Proof of Concept model for LWI TO4
Model Software Version
HEC-RAS version 6.3.1Model Application
LWI R7 Lake Maurepas St. John the Baptist SWMP PoCSimulation Type
PRODUCTION_RUNInput Files
| Title | Description | Location |
|---|---|---|
| b file | RAS master input text file | LM_West.b48 |
| g file | RAS geometry file | LM_West.g08 |
| c file | Binary Geometry file from Geom Prep | LM_West.c08 |
| x file | Geometry master input text file | LM_West.x08 |
| u file | unsteady flow file | LM_West.u09 |
| u hdf file | unsteady flow file in HDF format | LM_West.u09.hdf |
Output files
| Title | Description | Location |
|---|---|---|
| p file | Model plan data | LM_West.p48 |
| p hdf file | result output in HDF format | LM_West.p48.hdf |
Parameters
| Parameter | Value |
|---|---|
Temporal extent
| 2023-01-01 |
| 2023-01-03 |
Temporal resolution
5SECResource Files
Info: Please log in to view and download resource files.
Metadata record information
| Created By | kslover@dewberry.com |
| Created At | 2025-06-28t14:23:48.122089+00:00 |
| Access Level | Public |
| Is Reviewed | True |
| Owner | kslover@dewberry.com |